Sheet C-10 · Rev 04

Commercial · Reference design C-10

Event & Exhibition Pavilions

A modular exhibition pavilion is a building, not a stand: it carries its own structure, envelope and exits, and it is drawn around the date it opens and the date it comes down.

A01 · Open pavilion

Decision Rooms

Four decisions before anything is ordered

Run length

How long it stands, and whether it comes down

A three-week run, a season and a permanent building want different ground works, a different envelope specification and different attention to every joint. Nothing else about the design turns on one answer as much as this one does. Settle it before the frame is ordered, and where there is real doubt, specify for the longer of the two.

The joint is where run length shows. A junction detailed to be unscrewed, inspected and screwed up again is not the same junction as one sealed shut for the life of the building. Choosing the demountable version for something that will never move is buying an option you have already decided not to take.

Long leads

Which components have to be ordered first

An opening date does not move, so the programme runs backwards from it and the long-lead items go first, whatever else is still being argued over. Frame, glazing and any purpose-made screen are the three that will not be hurried. Decide those three early and let the rest of the brief catch up with them.

Crowd route

Where the queue stands and where the exits are

Arrival, the queue, the route through, the exits and the crush at the end of a talk are plan decisions, and they are the ones a licensing officer asks about first. Draw them against your expected peak rather than your average hour, and agree that peak with your organiser before anything else is fixed.

Second life

Where it goes next, and who holds it between

Reuse is real only if somebody has decided at the start where the components go afterwards and who keeps them in the interval. A schedule, a store with a roof and a named owner are what turn a demountable building into an asset. Name that owner now, in the same meeting that fixes the date.

Name that owner at the start. Somebody has to hold the component schedule, record what came back damaged, order replacements and keep the store dry between events, and it is a job nobody thinks to assign until the lorry is being loaded. It is one person’s part-time work, and it is what makes the second event real.

Field note · C-10

Every other building on this site is drawn to stay. This one is drawn to come down cleanly, on a date that was in the diary before the first component was ordered.

The buyer’s folio

The pavilion buyer’s folio

The folio is for a brand, an organiser or an institution planning a pavilion against a fixed date: what separates it from a stand, what the room has to do when it is full, how it comes apart afterwards, and what is handed over before anything is committed.

01A building, not a standWhat separates a pavilion from a booth, why that changes the approvals, and what the approach has to hold.

A pavilion is not a large stand. A stand is furniture inside somebody else’s hall, borrowing their roof, their floor loading, their exits and their licence. A pavilion carries its own envelope, its own structure, its own escape routes and its own relationship with the ground, and whoever grants permission assesses it as a building.

A stand is furniture in somebody else’s hall. A pavilion is a building.

That distinction is what makes the programme the first conversation. A building has to be designed, approved, manufactured, transported, assembled, tested and handed over against a date that will not shift, and every one of those steps sits on a schedule running backwards from the opening rather than forwards from today.

Most of the audience will only ever see the outside.

IN SHORT — Its own structure, its own exits, its own ground — and a service face agreed before the queue is planned.

02Inside, on the busiest hourWhat the room has to do when it is full, and the four zones that decide whether it works.

Back of house on an event building is small and entirely necessary: a crew room, a technical store, somewhere to charge and repair things, stock for whatever is handed out, and a place to put the packaging. Leave it out and it appears anyway, behind a curtain, in the corner your best photograph was going to come from.

Design for the worst hour, not for the photograph.

Services are temporary in duration and permanent in consequence. Supply and distribution, lighting, data, cooling, and water where there is catering all come to named points, and the difference between a coordinated pavilion and an improvised one is a cable route on a drawing instead of tape across a floor on opening morning.

Weather is the risk nobody plans for. An outdoor run in an Indian season means wind on a large light envelope, water at the ground interface and heat through glass, and each of the three is either designed for or endured. Designing for them is straightforward on paper; enduring them ruins the only days that mattered.

The reason for a pavilion is the conversations somebody has inside it.

IN SHORT — A route that works when full, a display zone that was planned, a quiet corner that survived, and a crew room.

03How it comes apartThe frame, the reversible joint, the component schedule, and what the ground looks like once the pavilion has gone.

Nothing habitable travels, on this product least of all. What moves between sites is frame members, panels, glazing units, screens and fixings, banded and stacked flat, exactly as they arrived the first time. There is no finished volume on a lorry and nothing room-shaped lifted into place, whatever moving a demountable building may suggest.

Nothing gets cut to fit on site, because a cut component has no second use.

Reuse is a discipline rather than a property. Components come back inspected, damaged ones are replaced against the schedule, gaskets and seals are treated as consumables, and the store keeps them dry. Do that and a second and third use are ordinary. Skip it and the building is single-use with extra steps.

Reuse is a discipline, not a property of the building.

IN SHORT — A reversible joint, a marked component, a designed ground interface, and a schedule that outlives the first event.

04What comes before anything is orderedHow the pavilion reaches your ground, what the group’s figures cover, and the limits this page keeps to.

Frame members are fabricated in the factory. Panels, roof build-up, glazing units, screens, linings and fixings are manufactured and shipped as loose material, banded and labelled to the assembly order. On your ground the setting-out is marked, the frame is stood, panels go on dry, the envelope closes, and the fit-out follows in that same order every time.

Material arrives banded and flat, and leaves the same way when the run ends.

More than a hundred projects, sixty to ninety days on site and a twenty-five year warranty are the record of the manufacturing group. They are quoted here as a record and not as a programme committed to your pavilion, and each belongs to a quotation written for one project rather than to this page.

We claim no figure of our own for structure, fire, wind, heat or sound, and none at all for capacity. Any standard bearing on those is named, and certification belongs to your consultant and to whoever grants your permission. There is no price here either: a pavilion is quoted against its run, its ground and its programme.

One person holds the component schedule, and that is what makes the second event real.

Search for this building and you are shown architecture journalism, a membrane supplier, a portfolio site and several companies selling stands. One result is a whole pavilion, and it is a finished project abroad rather than a supplier explaining how one gets built to a fixed date. That explanation is what this page exists to be.

IN SHORT — Components arrive flat, the pavilion is built on your ground, and the second use is decided before the first.

Questions to close before the date is announced

Is this a pavilion building or a large exhibition stand?

A building. It carries its own structure, envelope, escape routes and relationship with the ground, and whoever grants your permission assesses it as a building. A stand is furniture inside somebody else’s hall, using their roof, their floor and their licence. The two are different purchases with different approvals behind them.

What is the assembly and dismantling sequence?

It is drawn before anything is ordered, and this page will not put a duration on it before your brief exists. The sequence will be reversible, every component marked against the assembly drawing, and the crew taking the building down will work from the same sheets as the crew that put it up.

Does it genuinely come apart, or is that a figure of speech?

Genuinely, and it is designed in rather than hoped for. Fixings stay reachable, the assembly sequence is reversible, and every component is marked against the drawing. What matters more is what happens next: a store, a schedule and somebody named to keep both. Without those three, demountable describes only the first day.

What about weather during an outdoor run?

It is designed for rather than endured. Wind on a large light envelope, water at the ground interface and heat through glass are the three that decide whether a run is comfortable, and each is settled with your engineer against your season and your ground. This page states no wind, thermal or structural figure as ours.

What travels between sites?

Frame members, panels, roof build-up, glazing units, screens and fixings, banded flat and numbered against the assembly drawing. That is what a lorry carries to your ground the first time and every time after it. A demountable building never becomes a travelling room; the parts travel, and the pavilion is assembled where it opens.

Who is responsible for the ground, the power and the permission?

You and your consultants, from your survey and your organiser’s site rules. We draw the loads to the ground, the service points and the reinstatement expectation as a coordination boundary; the bearing, the supply, the consent and the licence belong to your site. All of them settle before a component is manufactured.

One pavilion, drawn for your ground