Sheet T-04 · Rev 04

Technical · Reference design T-04

GMP Modular Cleanrooms & Controlled Environments

Your consultant names the grade, owns the qualification and signs what it is tested against. Modular cleanrooms are drawn backwards from that decision and assembled on your ground.

A01 · Louvred technical block

Decision Rooms

Four decisions taken before a wall exists

The grade

Where the grade line falls across your plan

Somewhere on the plan a line is drawn, and on one side of it the air, the surfaces and the people are controlled. Where that line runs, and how many grades sit inside it, comes from the consultant who writes your validation strategy against your product and your licence. Bring their answer and the envelope can be drawn around it; bring a floor area and it cannot.

The grade is also the most expensive thing to get wrong in either direction. Set it high and the plant it demands, the air it moves and the testing it needs all follow upward for the life of the room. Set it low and the regulator closes the argument for you. The person who names it should be in the first meeting.

The flows

Whether people and material cross the line on the same side

People gown in one direction, material comes in cleaned in another, and waste and finished product leave by routes that must cross neither. Where those four lines run decides the plan before a wall exists, and they come from your process rather than from a standard layout. Draw the flows first, on paper; the room is largely a consequence of them.

Services scope

How much of the air handling belongs to this order

The envelope is one purchase and the air handling, filtration, pressure control, monitoring and building management are another. Projects split them differently, and every split works as long as somebody has written down which is which. Settle it before the enquiry, because a quotation for an envelope and a quotation for a controlled environment are different documents.

Who qualifies

The qualification programme, and whose name is on it

Design qualification, installation and operational qualification, performance qualification and the requalification that follows them belong to your quality organisation and the specialists it appoints. We build to the specification they issue and hand over what they need in order to test against it. Agree the programme and its acceptance criteria at the start, because they decide what the envelope must be able to prove.

What we hand that programme is documentation of what was built and how, not an assurance that it will pass. The distinction matters. A supplier promising a pass is promising something they do not control, because the room is qualified in operation, with your people, your process and your plant running inside it.

Field note · T-04

A controlled area is designed backwards from the grade your licence requires, which is why the first useful conversation is about your product and not about our walls.

The buyer’s folio

The project engineer’s folio

Four short chapters for a project engineer: why the grade decides everything, what the envelope has to be able to prove, how the room is built on the ground you have, and which questions close before a number means anything.

01The grade decides the roomWhy the first decision belongs to your consultant, what a boundary looks like from outside it, and why no performance figure appears on this page.

A class is the easiest thing to put at the top of a page and the least useful, because a class belongs to the product being made rather than to the supplier making the walls. What a buyer can use is the list of things that class will oblige them to decide. That list is what this page is.

A class belongs to the product being made, not to the supplier making the walls.

It is also why no figure appears here for air changes, pressure difference, recovery time, particle count or temperature and humidity tolerance. Each is an output of a design nobody has done for you yet, and a number published before that design is a number your validation consultant strikes out on the first reading.

Draw the four flows on paper and most of the plan has already been decided.

IN SHORT — Grade, process and flows come from your side of the table; the envelope is drawn after them.

02What the envelope has to doCleanable junctions, door schedules and the second building of plant above the ceiling — and who writes the specification for each.

None of this is unusual. It is the ordinary discipline of a controlled area, and it is written into your consultant’s user requirement specification long before a supplier is chosen. Our part is to build an envelope that the specification can be tested against, and to say plainly which parts of the room we are not supplying.

The envelope has one job: to be cleanable, and to stay cleanable.

The plainness is deliberate. A supplier who lets a buyer assume the air handling is included has not made a sale; they have scheduled a dispute for a later date, when the room is finished and the programme has nothing left to give. We would rather have the argument now, on paper, with both names on it.

An assumption about scope is a dispute with a later date on it.

IN SHORT — Junctions, doors and access are specification decisions; we manufacture to the specification and name what we exclude.

03Made on site, from componentsA steel frame, dry-fixed panels and no wet trade — and the two crossings that every controlled area is judged on.

Engineering of the shell - frame, panels, fixings - is carried out on your project by a licensed professional, to whatever loads and local conditions your engineer sets down. No span, load or fixing figure is published here. The number that counts is worked out for your ground and signed by whoever worked it out.

An airlock is a small room with two doors that are never open together.

Beside the drawings we draw up a services interface schedule with you before anything is ordered. Air handling and filtration, pressure control, temperature and humidity, lighting, small power, gases, water, drainage, fire detection, access control, monitoring and the building management system each take one row and one owner: our order, yours, or a separate appointment.

A crossing that is a little too small is used wrongly within a week.

IN SHORT — One method, two crossings, and one named owner against every service the room depends on.

04What is settled before anything is madeWhat we hand the qualification programme, the inputs a quotation needs, when the sheets are drawn, and the claims we refuse to make.

The inputs are short and you already hold most of them: the grade and standard being specified to, the process and its flows, the equipment list with its heat and service demands, whether the area sits inside an existing building, the services split you want, and the qualification programme with its dates on it.

We document what was built. We do not promise a pass on a test we do not run.

The workshops behind this studio have delivered more than a hundred projects and hold to a sixty to ninety day programme once assembly begins. Those numbers belong to the group and are restated against each building when we quote. Neither describes a controlled area, and neither is a validation programme.

Validation runs on your calendar, with your consultant, and it usually outlasts the assembly that precedes it. Any programme we write around it is a programme for the envelope only, stated as such, so that nobody in your organisation plans a batch against a date that was never ours to give.

Nobody should plan a batch against a date that was never ours to give.

We do not claim a controlled area can only be made this way; it is built conventionally every day. What recommends off-site components and on-site assembly is a plant that cannot absorb months of wet work, a site far from skilled labour, and a boundary that has to be clean before it is anything else.

IN SHORT — Six inputs, one schedule and no invented figure — and sheets once a grade and a design are settled.

What a quality head asks first

Do you certify the room to a GMP grade or an ISO class?

No. Classification is named by your consultant against your product and your licence, tested by the specialists your quality organisation appoints, and recorded in your own qualification documents. We build the envelope to that specification and hand over what the testing needs. A supplier who states a class before your process is known is describing somebody else’s project.

Is the air handling included?

Only if your order says so. The envelope — frame, panels, ceiling, doors, finishes — is one purchase; air handling, filtration, pressure control, monitoring and the building management system are another. The services interface schedule we draw up with you puts a single named owner against every line, so neither side has to assume anything.

Can it be built inside an existing plant building?

It can be, and it changes the enquiry. An area inside an existing hall inherits that building’s slab, levels, structure and services, so the survey comes first and the host building’s limits become design inputs. A separate building on the plot carries its own envelope and weather instead. Say which one you have.

Hardwall or softwall — which do you build?

We build the way everything else here is built: a steel frame carrying manufactured panels that are screwed rather than bonded, sent flat and put together on your ground. Whether your specification also calls for a lighter enclosure inside that shell is a question for the consultant writing it. The construction method is ours; the specification it is built to is yours.

What does an answerable enquiry contain?

The grade and standard being specified to, the process flows for people, material, waste and product, the equipment list with its heat and service demands, whether the area sits inside an existing building, the services split you want, and your qualification dates. Send those and the figures that come back describe your room.

Can the controlled area be extended later?

Say so at the start and it becomes a design input, because an extension is limited by the services spine and the flows rather than by the walls. Decide the eventual size while the plan is still on paper, build the part you need now, and the later phase becomes a construction decision instead of a requalification.

Bring the grade and the flows