Sheet C-02 · Rev 04

Commercial · Reference design C-02

Modular Marketing Offices

Your launch team works from it for a campaign, and every buyer reads it from the road before a brochure. A modular marketing office, engineered off site and assembled on your plot.

A01 · Long suite component

Decision Rooms

Four decisions before the launch date

Which face

The glass turns to the road, or into the plot

The public front is one long wall of glass under a deep roof, and it can only face one way. Turn it to the approach road and a driver reads a lit interior before deciding to turn in. Turn it into the plot and your visitors sit looking at the land they are buying. The plan does not change. The elevation does. Decide it with the site layout open.

Both orientations can be drawn on one plan and set side by side before the plinth is out. Nothing inside moves between them. What moves is which wall carries the panel bay and which carries the glass. Settling that on paper is cheap; discovering it once the frontage stands is not, and by then a campaign is running.

Front and back

How much of the plan a stranger ever enters

This building does two jobs at once. Part of it is a room anybody may walk into: reception, the display wall, the table where a booking is written. The rest is your team’s, with desks, a room that locks, a pantry and a door for deliveries. Where the line falls between the two fixes the staff entrance, and that is far easier to move on paper.

Screen or panel

Fins on the afternoon flank, or a closed bay

One flank takes the afternoon sun. It can be glazed and screened with vertical aluminium fins, which keeps the daylight and cuts the glare across a laptop, or closed with a solid panel bay that gives your team a wall to hang the layout plan on. The choice changes what the side road sees. Your sales lead should make it rather than leave it to the elevation.

After the launch

Whether it is drawn to come apart again

The frame is bolted and the panels are screwed, so nothing on this building is poured, laid or applied wet. Whether it is also drawn to be taken down and re-erected on your next site is a separate decision, and it belongs at the drawing stage rather than at the end of the campaign. Say which you want before the plinth is set out.

A building drawn to come apart is drawn differently. Panel joints are set out to be unscrewed, services are run so they can be broken at a point, and the plinth is treated as separate work at each site. None of that is expensive to draw at the start and all of it is impossible to add at the end. If you already know the office moves, say so now.

Field note · C-02

A launch building is judged in the first ten seconds, from a moving car, before anyone on your team has said a word.

The buyer’s folio

The developer’s launch-building folio

The long read, in four chapters, written for the person who signs for this building and then works inside it through a launch. Read them in order — each answers the question the one before it raises.

01What the road seesWhy this building is judged from the pavement, and what the approach is drawn to do about it.

A launch campaign takes a long stretch of a developer’s attention and this building is on the plot for all of it. A hired unit parked on hardstanding tells a visitor what the finished flats will be like, and they are right to read it that way. A designed elevation, a real threshold and a lit interior say the opposite, and saying it costs the campaign nothing.

A buyer reads this building from the road before they read a brochure.

This is the building your team works from. It is not the sales gallery, which is a different room with a different job: a model, a material board, a place to close. A launch can run both on one plot, or fold the display into the office. Settle which one you are commissioning before the plan is drawn, because they want different fronts.

Count the panel joints and you have counted the bays.

IN SHORT — One storey, one deep roof, a glass public face — and a working half nobody enters.

02Inside, in the order a visitor meets itReception, the display wall, the rooms that shut, and the half of the plan that stays yours.

A level route to the front door belongs in the plan from the start rather than at handover. Steps and ramp arrive at the same threshold, the threshold is flush, and the doors are wide enough for a wheelchair and for a scale model being carried in on its stand. That second one is not in any code. It is simply what happens the day before a launch.

The glazed front stays customer-facing; the delivery door never crosses it.

Your team is in here six days a week for the whole length of the campaign, which is a long time to work in a room that was treated as temporary. So the pantry is a real pantry, the washrooms sit on the service side rather than off reception, and the desks get daylight from the same front the visitors do. Those are operating decisions and the plan will show them.

Branding is drawn, not stuck on. The fascia above the entrance, the panel bay beside it and the wall behind the desk are the three surfaces your identity lands on, and each will be set out on the elevation so an agency can work to a dimension instead of to a photograph. None of the building’s own finish has to change to carry a campaign.

Branding belongs on the elevation, not stuck on at handover.

IN SHORT — Reception, a display wall, rooms that shut — and a working half with its own door.

03What it is actually made ofSteel, panels, glass and screens, and what a joint tells a buyer about how a building was made.

The wall panel, the roof panel and the cladding will be named on the specification by what they are and by what they are finished to look like. A panel may look like stone, or like fine-ribbed timber; it stays a panel, and the joint grid says so plainly. What we will not describe is a wet trade, because that is not how this building is made.

There is no mortar line anywhere on this building.

What arrives on your plot is a load of material: framing members, flat panels, roof sheets, crated glazing, fin sections, fixings and the fit-out, banded and labelled in the order they are wanted. The sequence is set against your launch date rather than against a production schedule, because the date is the one thing on this project that cannot move.

The fin bay is a decision, not a detail.

IN SHORT — Steel frame, screwed panels, an even joint grid — and a lit soffit that works after dark.

04What you get before you commitHow far this design has got, what will be drawn, what we will not claim, and where today’s first page stops.

What the design studies for this building share is settled enough to describe: the single storey, the deep roof plane over the entrance, the glazed public face, the panel bays, and a flank that takes either a fin screen or a closed bay. Which study becomes the design is not settled, and no finish is named here because the palette family is assigned when it is.

If you already know the office moves, say so now.

The manufacturing group records sixty to ninety days on the ground, and each quotation narrows that to the project in front of it. What the figure does for a launch team is turn the building into a fixed point in the campaign plan instead of an open variable, which is the only reason it earns a place on this page at all.

There is no engineering figure on this page put forward as ours. No load, no fire rating, no acoustic number, and there will not be one until a licensed professional on your side has signed it against your plot. The figures we do publish belong to the manufacturing group and to no single product: more than a hundred projects delivered, and a twenty-five-year warranty qualified for each one.

A sheet named before it exists is a promise, not a document.

What ranks for this search today is mostly proof of delivery: a finished project in a named city, a photograph, a telephone number. Those are worth something and we are not pretending otherwise. What none of them hands a launch team is a plan they can put in front of their own architect and mark up before a single component is ordered.

IN SHORT — A form the studies hold in common, a colour assigned later, sheets after that — and the limits printed.

What a launch team asks first

How is this different from a hired building parked on the plot?

It is a designed building rather than a hired one. Steel frame, manufactured panels, full-height glazing, a drawn entrance and a service side that never crosses the front. It will be set out on a plan you can mark up, it carries your branding on surfaces drawn for it, and it is meant to be looked at from the road.

Where can our branding go, and how big can it be?

Three surfaces take it: the fascia above the entrance, the panel bay beside the doors and the wall behind the reception desk. Each will be dimensioned on the elevation when the set is drawn, so your agency works to a measurement rather than guessing from a photograph. Nothing on the building’s own finish needs changing to carry a campaign.

Can we move it to the next project when the launch closes?

The joints are dry and screwed, so it is a fair question rather than a fanciful one. It has to be answered at the drawing stage, because a building set out to be unscrewed is detailed differently from one that is not. We publish no number of relocations and no reuse warranty, because neither has been measured.

What can we see before we commit to anything?

Today, what all four studies hold in common, plus the four decisions above. Thirteen A3 sheets follow the choice of a design, and not one has been drawn. Saying that plainly is more use to you than implying a folder is already waiting, and it is the difference between a reference and a brochure.

How long is it on our plot before the team can work in it?

The window quoted to you is the manufacturing group’s record, narrowed per project in the quotation. It begins after the plinth is set out, and it turns on ground you have not had surveyed yet. Treat it as a fixed point to plan the campaign around, not as a promise made before anyone has walked your site.

Who decides the internal layout, you or us?

You do, on our plan. The four decisions on this page are the ones that change the building rather than the furniture: which face carries the glass, where the line falls between public and staff, whether the flank is screened or closed, and whether the whole thing is drawn to come apart. Everything else follows them.

Drawn before the campaign is announced

Start a Project