Technical · Product family T-01
Advanced Modular Technical Buildings in India
Modular technical buildings are not lived in. Each of the five exists to protect something — equipment, a controlled process, research work, computing, or the people watching a plant.
Issued index
Five buildings that protect a process
Sector drawing ribbon
See how setting and programme shape specialist facilities governed by performance and controlled interfaces.
Questions
Questions to settle around specialist facilities governed by performance and controlled interfaces.
Which of the five is our building?
Name what has to be protected. Electrical equipment on a plant, a controlled area for a regulated product, research work and its services, computing and its support systems, or a room people occupy continuously. Each has its own page. If two seem to fit, the schedule of what goes inside will separate them faster than a conversation will.
Do you supply the equipment and the systems inside?
Not by default, and never by assumption. The building is the default scope; equipment, process systems, air handling, continuity plant, consoles and automation are specified and usually bought elsewhere. Whichever items your order includes are written into an interface schedule drawn up with you, which names one owner against every line.
Do you state a class, rating, certification or availability figure?
Never, for any route in this section. A consultant you appoint names whichever published standard governs your installation, your engineer signs off the design against it, and specialists of your choosing carry out the testing. We build to that specification and document what was built, which is a narrower claim and a checkable one.
Can these be built on a site that is operating?
They are meant to be. Components travel flat and banded on ordinary vehicles and the building is put up in position, so nothing habitable crosses a live yard. What has to be agreed first is the access route, the laydown area, permit conditions and any shutdown window your operation can actually give you.
Can we see drawings for these five?
Not yet. None of these designs has been selected, so there is no plan, section or schedule to send, and we would rather say that than send you somebody else’s. What we can do at enquiry stage is work through the input list and start the interface schedule with you, which is where the real answers are.
What has to reach you before a quotation is possible?
The schedule of what goes inside with its weights and heat, the standards your consultants are specifying to, the site survey with access, laydown and any shutdown window, and the date the operation needs the building. Those four are enough to start, and anything still missing is named as an assumption instead of buried inside a figure.
Send the schedule, not the enquiry form
Tell us what the building has to protect, what your site can give and when the operation needs it, and we will start the interface schedule with you and say plainly what is drawn and what is not.