Residential · Product family R-01
Luxury Modular Homes & Prefab Residences in India
Luxury modular homes are not one product. Five residences are published here, and each answers a different question about how a family lives on a particular piece of land.
Issued index
Five residences for private land
Signature designs · Residential
See how setting and programme shape private homes shaped around land and long-term living.
Sheet R-02Size pending
Luxury Modular Homes
A primary house organised around a court, for a family building on their own plot and living in it every day of the week
Reference R-02RESIDENTIALGA pending
Sheet R-03Size pending
Prefab Villas
For a villa plot in a scheme, where one great room does the work and the decision is how much house should sit around it
Reference R-03RESIDENTIALGA pending
Sheet R-04Size pending
Prefab Farmhouses
For land you already own and visit. The building answers to the field, the trees and the approach rather than to a street, and it locks up cleanly
Reference R-04RESIDENTIALGA pending
Sheet R-05Size pending
Premium Holiday & Second Homes
A second home used in bursts, drawn around the one view worth building for, and closed up safely for the weeks nobody is there
Reference R-05RESIDENTIALGA pending
Sheet R-06Size pending
Guest Houses & Garden Suites
The second building on a plot that already has a house — guests, parents or a studio, near enough to be useful and separate enough to be private
Reference R-06RESIDENTIALGA pending
Questions
Questions to settle around private homes shaped around land and long-term living.
Which of the five suits my land?
Start with how the house will be used rather than with how big it is. A primary home, a weekend building on land you already own, a second home built for a single view, and a guest building beside an existing house are four different briefs, and each has its own page here. Where two still fit, your plot settles it.
What do the drawings show before I commit to anything?
For four of the five there is a full A3 set: where the house sits, a furnished plan with its dimensions on it, elevations named by the direction they face, sections, the build-up details and a general arrangement in plain language. They go to your architect for checking. The farmhouse joins them when its design is drawn, and until then this page says so.
Why is there no price on any of these pages?
Because a house is quoted against a plot, and your plot has not been seen. Access, ground, levels, distance from labour and material, the size you actually need and the finishes you choose all move the figure. A number published before those are known would belong to somebody else’s project rather than to yours.
Who is responsible for approvals, foundations and levels?
They stay with you and your consultants, and they are project inputs from the start. Your surveyor sets the levels, your engineer designs the foundations for your ground, and approvals are pursued in your name. The drawings are prepared so those people can do their work properly, not so that they can be skipped.
Can you build on a steep or distant plot?
That is where this method earns its place. Everything reaches you flat and banded, and the house is assembled where it stands, so there is no long wet programme to keep supplied on a hillside or three hours from a town. Access is measured before anything is agreed, because a lorry that cannot turn is a real limit.
How long does it take?
The assembly programme on site is the group’s sixty to ninety day record, qualified for each project. It is not the whole story. Choosing the design, adapting it to your plot, your approvals and your own decisions all come first, and they run at the pace you and your consultants set rather than ours.
Tell us about the land before you choose the house
Send the plot — a survey, an address, or a few photographs — and we will say which of the five belongs on it, with the sheets for whichever of them is drawn.
